Due April 29.
COMMENT:
We recommend that you bring a printed copy of your design report to the competition and proof of submission.
Showing posts with label Minutes. Show all posts
Showing posts with label Minutes. Show all posts
Tuesday, April 27, 2010
Friday, April 9, 2010
Gearing Up
Gear Box - approx CNC mill time 45 hours
Floatation - Steps
Floatation - Steps
- Rough Shape
- Contact Cement
- Attach to skid plate
- Attach to frame
- Shape pefectly
- Heat seal
- Cover
- Don't sink!
Monday, November 16, 2009
20th Full(ish) Meeting
Nov. 10 & 12
Fire drill? Electrical short?
FEM and mesh done.
First draft of the report due Tuesday.
Two-part foam kind of cheap, still look for a free sample to test.
Fire drill? Electrical short?
FEM and mesh done.
First draft of the report due Tuesday.
Two-part foam kind of cheap, still look for a free sample to test.
Monday, November 9, 2009
18th Full(ish) Meeting
Prototyped a little more.
Tuesday, November 3, 2009
17th Full(ish) Meeting
We finished the PPT and presented in class.
Saturday, October 31, 2009
15th & 16th Meeting
For Oct. 27 & 29:
Attempted to run a load/stress simulation using Solidworks 2009.
Meeting to finish prototype was scheduled for Oct. 31.
Presentation was outlined.
Attempted to run a load/stress simulation using Solidworks 2009.
Meeting to finish prototype was scheduled for Oct. 31.
Presentation was outlined.
- What is a Mini-Baja?
- What are the major components we must deal with?
- What is the competition about?
- What have research and and past designs revealed?
- What were our inital concepts?
- Why did we chose our current designs?
- Gantt Chart showing our production goals?
Thursday, October 22, 2009
14 Ful(ish) Meeting
Did two more pieces of model, we need more PVC pipe.
More talk about design.
More talk about design.
13th Full(ish) Meeting
For October 20 2009:
-Watched Brian and Roi continue to work on the model. Very impressive.
-Some inspector dude came around?
-Watched Brian and Roi continue to work on the model. Very impressive.
-Some inspector dude came around?
Friday, October 16, 2009
12th Full(ish) Meeting
I'm using Visio 2007 to make the Gantt Chart.
If you have Visio you can go under scheduling >> Gantt Chart
If not you can use Gantt Project at http://www.ganttproject.biz/
Or OpenProj at http://openproj.org/openproj
If you have Visio you can go under scheduling >> Gantt Chart
If not you can use Gantt Project at http://www.ganttproject.biz/
Or OpenProj at http://openproj.org/openproj
Tuesday, October 13, 2009
11th Full Meeting
For October 13 2009:
Started PVC-modeling.
Dean and ABET board will do a walk-through so the shop must be cleaned and organized further.
Started PVC-modeling.
Dean and ABET board will do a walk-through so the shop must be cleaned and organized further.
Monday, October 12, 2009
10th Full Meeting
For October 8 2009:
Must start building.
Must start building.
Wednesday, October 7, 2009
9th Full(ish) Meeting
For October 6 2009:
Talked with the professor about building a full scale wooden model and that we must be quicker to the build then the rest of the class.
Cleaned up the cellar to make room for the build.
Talked with the professor about building a full scale wooden model and that we must be quicker to the build then the rest of the class.
Cleaned up the cellar to make room for the build.
Sunday, October 4, 2009
8th Full Meeting Minutes
For October 1 2009:
More talk about design and gear and parts.
Submitted Requirement report to professor.
More talk about design and gear and parts.
Submitted Requirement report to professor.
Friday, September 25, 2009
7th Full(ish) Meeting Minutes
For September 24, 2009:
Project Requirement Paper due has been pushed backed to October 1.
- It should be one page, listed how he described before, and with a short opening and closing paragraph.
Looked for gear, keeping in mind of the 44:1 ratio.
Looked for more specification for the water trials but found little.
Project Requirement Paper due has been pushed backed to October 1.
- It should be one page, listed how he described before, and with a short opening and closing paragraph.
Looked for gear, keeping in mind of the 44:1 ratio.
Looked for more specification for the water trials but found little.
Wednesday, September 23, 2009
6th Full(ish) Meeting Minutes
For September 22, 2009:
Short meeting discussion of what is new.
The new Rules for 2010 are up http://students.sae.org/competitions/bajasae/rules/
Forum for rules http://forums.sae.org/access/dispatch.cgi/bajasae_pf
Short meeting discussion of what is new.
The new Rules for 2010 are up http://students.sae.org/competitions/bajasae/rules/
Forum for rules http://forums.sae.org/access/dispatch.cgi/bajasae_pf
Thursday, September 17, 2009
5th Full Meeting
Met Glenn
Preliminary duties/assignments were set for each group member.
Preliminary frame design 33% complete.
Manuel will write a first draft for this assignment SEP 24 TH: PROJ. REQUIREMENTS DUE
Registration for the competition is October 5 and must be made quickly as space fills up fast.
Preliminary duties/assignments were set for each group member.
Preliminary frame design 33% complete.
Manuel will write a first draft for this assignment SEP 24 TH: PROJ. REQUIREMENTS DUE
Registration for the competition is October 5 and must be made quickly as space fills up fast.
Tuesday, September 15, 2009
4th Full Meeting Minutes
Brainstorm leads to final choices.
- Aquatic- Not chosen until rules come in.
- Drive Train- CVT+Reduction Box, maybe Manual Overdrive - Rear Wheel Drive
- Suspension- SLA (Short-Long arm)
- Brakes- Disk brakes
- Steering- 4 Wheel Steering
- Frame- Strength calculations - Roi is making one a preliminary design.
- Electronics- Listed.
- Ergonomics- Design later
- Aquatic- Not chosen until rules come in.
- Drive Train- CVT+Reduction Box, maybe Manual Overdrive - Rear Wheel Drive
- Suspension- SLA (Short-Long arm)
- Brakes- Disk brakes
- Steering- 4 Wheel Steering
- Frame- Strength calculations - Roi is making one a preliminary design.
- Electronics- Listed.
- Ergonomics- Design later
Saturday, September 12, 2009
3rd Full(ish) Meeting Minutes
Class lesson for Sept. 10, 2009:
Literature Search Establishment of Req.
-Patent Search is essential
--www.USPTO.gov
--www.PAT2PDF.org
--www.google.com/patents
--Internet searching
--Scientific papers/journals
--Library books
Catalogs of companies
Design Requirements 13 in all all must be addressed by Sept. 24
Minutes:
Literature Search Establishment of Req.
-Patent Search is essential
--www.USPTO.gov
--www.PAT2PDF.org
--www.google.com/patents
--Internet searching
--Scientific papers/journals
--Library books
Catalogs of companies
Design Requirements 13 in all all must be addressed by Sept. 24
Minutes:
- Prof. Sadegh informed us the frame is the most important part and it must be designed and ready above all.
- Jeff is in...
- Doug is out...
Tuesday, September 8, 2009
2nd Full(ish) Meeting Minutes
Class lesson:
Techniques for design process
-Creative problem solving
-Invention
-Brain storming
Next Class - Literature, patent, and research process.
Meeting : Went downstairs watched as Roi and Jon discussed the Mini-Baja.
-Recycle and reuse as much as possible.
-Maybe get better shock absorbers, coil? $3,000?
-Solidworks 2007 offered for group use, vote on this for next meeting.
-Multiple drivers needed, minimum weight and height requirements, license and medical insurance also required.
-5 second in-out test
Techniques for design process
-Creative problem solving
-Invention
-Brain storming
Next Class - Literature, patent, and research process.
Meeting : Went downstairs watched as Roi and Jon discussed the Mini-Baja.
-Recycle and reuse as much as possible.
-Maybe get better shock absorbers, coil? $3,000?
-Solidworks 2007 offered for group use, vote on this for next meeting.
-Multiple drivers needed, minimum weight and height requirements, license and medical insurance also required.
-5 second in-out test
Steering wheel, very removable.
Pedals
Front inside
Back
Thursday, September 3, 2009
1st Full Meeting Minutes
-Setting schedule:
- Ready to build by January
- Finished by April
- List the hardest to find items to purchase
- Previous competitions
- Which techniques can be used?
- How will the duties be distributed?